Plataforma de Doble Mastil: dos pozos a la vez? 🤔 #barents #norway🇳🇴 @norwelledge - *Dual Activity Drilling*  On a normal rig a single derrick handles all well operations, allowing one string of pipe or casing to be run at any one time.  On a dual activity rig a “double derrick” or “multi-purpose tower” is equipped to allow two strings to be run simultaneously.  This increased capability can allow for up to 40%-time savings when compared with traditional operations. The BOP and riser can be run in advance, and the next casing string can be made up into stands in preparation.  All of these steps save valuable time during a high-cost operation.  The first rig to be equipped with this capability was the Transocean Discovered Enterprise, built in 1998. The original patent, filed in 1996, was granted in the year 2000 and has since been challenged by Noble Corporation, Maersk and Seadrill. : : Photo credit: @krosslidrilling  #fridayfact #oilandgas #drilling #transocean #riglife #drillbabydrill #oilfield #petroleum #petroleumengineer #roughneck #righand #hydrocarbon #elearning #edtech #gettheedge - #regrannEn una plataforma normal, una sola torre de perforación maneja todas las operaciones del pozo, permitiendo que una sarta de tubería o revestimiento se corra en cualquier momento. En una plataforma de doble actividad, una “torre de perforación doble” o “torre de usos múltiples” está equipada para permitir que se corran dos sartas simultáneamente.  

Esta mayor capacidad puede permitir ahorros de hasta un 40% en comparación con las operaciones tradicionales. El BOP y el elevador se pueden ejecutar por adelantado, y la siguiente cadena de revestimiento se puede ir preparando en los soportes .  Todos estos pasos ahorran un tiempo valioso durante una operación de alto costo. 

La primera plataforma que se equipó con esta capacidad fue Transocean Discovered Enterprise, construida en 1998. La patente original, presentada en 1996, se otorgó en el año 2000 y desde entonces ha sido cuestionada por Noble Corporation, Maersk y Seadrill. :: 

Crédito de la foto: @krosslidrilling

@norwelledge – *Dual Activity Drilling* On a normal rig a single
derrick handles all well operations, allowing one string of pipe or
casing to be run at any one time. On a dual activity rig a “double
derrick” or “multi-purpose tower” is equipped to allow two strings to be
run simultaneously.

This increased capability can allow for up to
40%-time savings when compared with traditional operations. The BOP and
riser can be run in advance, and the next casing string can be made up
into stands in preparation. All of these steps save valuable time
during a high-cost operation.

The first rig to be equipped with this
capability was the Transocean Discovered Enterprise, built in 1998. The
original patent, filed in 1996, was granted in the year 2000 and has
since been challenged by Noble Corporation, Maersk and Seadrill. : :
Photo credit: @krosslidrilling

via Blogger http://bit.ly/2PXzvLj Equipos y Herramientas de Perforacion, Offshore, Taladro, TECNOLOGIA

Responder

Introduce tus datos o haz clic en un icono para iniciar sesión:

Logo de WordPress.com

Estás comentando usando tu cuenta de WordPress.com. Cerrar sesión /  Cambiar )

Google photo

Estás comentando usando tu cuenta de Google. Cerrar sesión /  Cambiar )

Imagen de Twitter

Estás comentando usando tu cuenta de Twitter. Cerrar sesión /  Cambiar )

Foto de Facebook

Estás comentando usando tu cuenta de Facebook. Cerrar sesión /  Cambiar )

Conectando a %s